top of page
logo
3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Los Gatos

in

Master Suite Addition, ADU and Deck

12-14 Months | $250k-275k

Master Suite Addition, ADU and Deck in Los Gatos

This comprehensive three-phase project was designed to elevate both living space and lifestyle, seamlessly integrating a new master suite addition, a fully equipped ADU build-out, and a complete front and backyard landscape/hardscape transformation.


Phase 1: Master Suite Addition


Built from the ground up, the new master suite was thoughtfully designed to create a private retreat within the home. The space features engineered wood flooring, crisp white walls, and elevated ceilings that enhance openness and natural light. Custom blinds and elegant French doors lead directly to the backyard, while an additional set of French doors connects the bedroom to the master bathroom, creating a smooth, luxurious flow.

The master bathroom was crafted as a spa-inspired sanctuary. Heated floors provide everyday comfort, while a freestanding soaking tub with an independent floor-mounted fixture serves as a stunning focal point. The walk-in shower includes a built-in bench, a rain shower head, and a wall-mounted fixture for a fully customized experience. Porcelain slabs were used for both the flooring and a dramatic accent wall, adding sophistication and continuity. A floating vanity topped with fabricated natural stone and dual sinks completes the modern, elevated design.


Phase 2: ADU Build-Out


The accessory dwelling unit (ADU), constructed on a raised foundation, offers a fully independent and versatile living space. Designed for comfort and functionality, it includes a kitchenette, full bathroom, sauna, mini-split HVAC system, and dedicated water heater. The layout maximizes efficiency while maintaining a modern aesthetic, making it ideal for guests, extended family, or rental income opportunities.


Phase 3: Backyard Paradise & Outdoor Living


The backyard was transformed into a private resort-style retreat. A custom-built deck with railings and stairs creates a strong architectural foundation for the outdoor space. Two pergolas and a beautifully designed pavilion define separate entertaining areas, enhancing both form and function.

The pavilion features a fully functional outdoor kitchen, perfect for hosting and year-round gatherings. The space is further elevated by the addition of a jacuzzi, completing the tranquil, spa-like atmosphere.


This three-phase project showcases thoughtful planning, seamless integration, and high-end craftsmanship—delivering expanded living space, modern luxury, and a true indoor-outdoor lifestyle experience.


Services provided: Backyard Design, General Design, Flooring, Addition, Bathroom Remodel, ADU, Painting, Electrical, Flooring, Plumbing.


Finishes/Hardware: 

Floor/walls Trims- Home Depot https://www.homedepot.com,

Tiles- Tilebar https://www.tilebar.com ,

Vanities/ Fixtures- Wayfair https://www.wayfair.com

- Rear Addition and Master Suite: $285k – $320k

- Backyard and Front Yard: $350k – $375k


*Please note construction times vary from project to project and scope of work. The length of projects does not include time for the planning process. Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.*

1_1ng.webp

ADU & Room Addition

Project Gallery

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

3_2.jpg

Complete Home Remodel & Addition

7-9 Months | $575k-650k

Milpitas

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Newly Built Home

10-12 months | $1.5M-$1.7M

Redwood City

3_2.jpg

Home Remodel

6-8 months | $400k-$450k

San Francisco

3_2.jpg

Complete Home Remodel and JADU

8-10 Months | $500k-600k

Saratoga

3_2.jpg

Home Remodel and Addition San Jose

8 -10 months | 400k -500k

San Jose 2023

3_2.jpg

Home Remodel

4-5 months | $120k-$130k

San Jose, 2024

3_2.jpg

Home Remodel & Addition

6-8 months | $270k-$290k

San Jose

3_2.jpg

Full Home Remodeling

Design by Golden View Renovation

Menlo Park

Related Projects

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

bottom of page