top of page
logo

Bathroom Remodel in San Carlos

By rethinking a layout that originally offered only a single shower and little storage, our team turned our client's San Carlos bathroom into a refined, and more functional retreat. The new design introduces clean lines and enhanced practicality with the addition of floating cabinets, creating a more open feel while maximizing storage.


A frameless glass shower door replaces the old enclosure, visually expanding the space and enhancing its modern aesthetic. The shower is upgraded with a sleek combo head system for a more versatile and luxurious experience. Recessed lighting was added to brighten the room and create a clean, streamlined ceiling. The result is a refreshed, contemporary bathroom that balances style with everyday comfort.


Finishes/Hardware: 

Tiles- Bedrossians https://www.bedrosians.com

Vanity- KZ https://www.kzkitchen.com

Finishes- Rubenstein https://www.rubensteinsupply.com


*Please note construction times vary from project to project and scope of work. The length of projects does not include time for the planning process. Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.*

1_1ng.webp

Design, Drafting & Planning

1_1ng.webp

Bathroom Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Kitchen and Living room remodel

4-5 months | $250k-$275k

Redwood City

3_2.jpg

Bathtub conversion

3-4 weeks | $24K-$26K

Redwood City

3_2.jpg

Bathroom Remodeling

6-8 weeks | $45K-$49K

La Honda

3_2.jpg

Home Remodel & Addition

6-7 months | $380k-$400k

Newark

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Kitchen Remodel

7-9 weeks | $47k-$53k

Foster City

3_2.jpg

Bathroom Remodels

2-3 months | $70k-$80k

Oakland

3_2.jpg

Bathroom Addition

3 months | $75k-$80k

Santa Clara

3_2.jpg

Kitchen & Living Room Remodel

2-4 months | $180k-$200k

Pacifica

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

San Carlos

in

Bathroom Remodel

1-1.5 months | $30k-$35k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page