top of page
logo

Kitchen and Living room remodel in Redwood City

This kitchen remodel in Redwood City began with a transformative change: the removal of a dividing wall to create a bright, open-concept space that seamlessly connects the kitchen to the surrounding living areas. In the heart of the new layout is a spacious island featuring a built-in sink, additional storage, and elegant pendant lighting that adds both functionality and style.


A standout design element is the intricate backsplash, adding texture and visual interest to the space, while warm gold fixtures throughout lend a touch of modern luxury. A large sliding window provides abundant natural light and direct access to the backyard, enhancing the indoor-outdoor flow that's perfect for entertaining or relaxing at home. In front of the window, a custom bench offers a cozy seating nook with a view. Topping off the remodel is a vaulted ceiling, giving the kitchen a sense of airiness and architectural charm that elevates the entire space.


Finishes/Hardware: 

Tile- Fireclay Tile- https://www.fireclaytile.com

Countertop- Bay Stone http://www.baystonedepot.com

Sink/fixtures- Tubz https://tubz.net

Wine Cooler- Wayfair https://www.wayfair.com

Flooring- Floor Depot- https://www.floordepot.us

Baseboards- The Moulding Company- https://www.themouldingcompany.com


*Please note construction times vary from project to project and scope of work. The length of projects does not include time for the planning process. Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.*

1_1ng.webp

Design, Drafting & Planning

1_1ng.webp

Kitchen Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Bathroom Remodel

1-1.5 months | $30k-$35k

San Carlos

3_2.jpg

Bathtub conversion

3-4 weeks | $24K-$26K

Redwood City

3_2.jpg

Bathroom Remodeling

6-8 weeks | $45K-$49K

La Honda

3_2.jpg

Home Remodel & Addition

6-7 months | $380k-$400k

Newark

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Kitchen Remodel

7-9 weeks | $47k-$53k

Foster City

3_2.jpg

Bathroom Remodels

2-3 months | $70k-$80k

Oakland

3_2.jpg

Bathroom Addition

3 months | $75k-$80k

Santa Clara

3_2.jpg

Kitchen & Living Room Remodel

2-4 months | $180k-$200k

Pacifica

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Redwood City

in

Kitchen and Living room remodel

4-5 months | $250k-$275k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page