top of page
logo

Bathroom Remodeling in La Honda

Located in La Honda, this spacious bathroom remodel showcases a balance of modern comfort and timeless, elegant design. The layout features a luxurious freestanding tub as a central focal point, complemented by an open shower with frameless glass panels.


The shower area is finished with varying gray and white tiles for a bright, fresh look, and includes a versatile combo shower head system. Charcoal-toned large-format floor tiles with a smooth, contemporary finish add contrast and a sense of grounding to the space.


Rich wood-tone cabinets bring warmth and natural texture, paired with dual sinks and sleek black fixtures for a fresh modern element. An electric towel rack adds a layer of everyday luxury, while a separate enclosed toilet room offers added privacy. The result is a thoughtfully designed, spa-like retreat that feels both expansive and refined.


Finishes/Hardware: 

Floor Tiles- Floor & Decor https://www.flooranddecor.com,

Rough Materials- Bedrossians https://www.bedrosians.com

Finish Materials- Tubz https://tubz.net


*Please note construction times vary from project to project and scope of work. The length of projects does not include time for the planning process. Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.*

1_1ng.webp

Design, Drafting & Planning

1_1ng.webp

Bathroom Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Bathroom Remodel

1-1.5 months | $30k-$35k

San Carlos

3_2.jpg

Kitchen and Living room remodel

4-5 months | $250k-$275k

Redwood City

3_2.jpg

Bathtub conversion

3-4 weeks | $24K-$26K

Redwood City

3_2.jpg

Home Remodel & Addition

6-7 months | $380k-$400k

Newark

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Kitchen Remodel

7-9 weeks | $47k-$53k

Foster City

3_2.jpg

Bathroom Remodels

2-3 months | $70k-$80k

Oakland

3_2.jpg

Bathroom Addition

3 months | $75k-$80k

Santa Clara

3_2.jpg

Kitchen & Living Room Remodel

2-4 months | $180k-$200k

Pacifica

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

La Honda

in

Bathroom Remodeling

6-8 weeks | $45K-$49K

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page