top of page
logo

Foster City

This Foster City remodel reimagines a once-compact kitchen into a bright and inviting space that feels both expansive and functional.


The design highlights a classic two-tone cabinet palette: crisp white upper cabinets that reflect light and warm oak-toned lower cabinets that ground the space with natural texture. A distinctive pendant light over the peninsula introduces sculptural interest and defines the transitional area between prep and dining zones. Complementing the layered lighting scheme, recessed ceiling lights offer clean, even illumination throughout.


White walls and new light-toned flooring further open the space, contributing to the airy, minimalist aesthetic. A full-slab backsplash adds a modern touch. With visual flow, the newly installed oven is seamlessly integrated between the base cabinets. Though the kitchen’s original structure was retained, the thoughtful redesign dramatically enhances the sense of space—making it feel noticeably larger, brighter, and more modern.


The result is a cohesive, elevated kitchen that balances functionality with refined design.


Finishes/Hardware: 

Davies Appliances https:www.daviesappliance.com

Valore https://valore-us.com

Apex https:apexstone.com

Coast Lighting https:www.coastlighting.com

VM Flooring and More https://vmflooringandmore.com


*Please note construction times vary from project to project and scope of work. The length of projects does not include time for the planning process. Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.*

1_1ng.webp

Kitchen Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Bathroom Remodels

2-3 months | $70k-$80k

Oakland

3_2.jpg

Bathroom Addition

3 months | $75k-$80k

Santa Clara

3_2.jpg

Kitchen & Living Room Remodel

2-4 months | $180k-$200k

Pacifica

3_2.jpg

Home Remodel

4-5 months | $120k-$130k

San Jose, 2024

3_2.jpg

Home Remodel & Addition

6-8 months | $270k-$290k

San Jose

3_2.jpg

Beautiful Bathroom Remodel

1-1.5 months | $35k-$38k

Burlingame

3_2.jpg

Open Living Space

3-4 weeks | $30k-35k

Redwood City

3_2.jpg

Master Bathroom Addition

3-4 months | $120k-$130k

San Jose

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Foster City

in

Kitchen Remodel

7-9 weeks | $47k-$53k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page