top of page
logo

Santa Clara

This bathroom addition in Santa Clara was designed to integrate seamlessly into the existing home while introducing a clean, contemporary aesthetic focused on functionality and spatial clarity.


The layout centers around a dual-sink vanity that provides symmetry and efficiency for shared use, paired with modern cabinetry and streamlined fixtures to maintain a cohesive visual language.


The walk-in shower features soft gray porcelain tiles that bring texture and tone without overwhelming the space. A removable bench adds flexibility for comfort and accessibility, while a half wall topped with frameless glass balances privacy with openness—maintaining a light, airy atmosphere.


A wall-mounted, tankless toilet enhances the minimalist design and reinforces the sense of openness by freeing up floor space. The moderate material palette, along with thoughtful spatial planning, results in a modern yet timeless retreat that blends practicality with an elevated design.


Finishes/Hardware: 

Flusso https://www.isenbergfaucets.com

BidetMate https://bidetmate.com

Wayfair https:www.wayfair.com

Home Depot https:www.homedepot.com

Tilebar https://www.tilebar.com


*Please note construction times vary from project to project and scope of work. The length of projects does not include time for the planning process. Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.*

1_1ng.webp

Bathroom Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Kitchen Remodel

7-9 weeks | $47k-$53k

Foster City

3_2.jpg

Bathroom Remodels

2-3 months | $70k-$80k

Oakland

3_2.jpg

Kitchen & Living Room Remodel

2-4 months | $180k-$200k

Pacifica

3_2.jpg

Home Remodel

4-5 months | $120k-$130k

San Jose, 2024

3_2.jpg

Home Remodel & Addition

6-8 months | $270k-$290k

San Jose

3_2.jpg

Beautiful Bathroom Remodel

1-1.5 months | $35k-$38k

Burlingame

3_2.jpg

Open Living Space

3-4 weeks | $30k-35k

Redwood City

3_2.jpg

Master Bathroom Addition

3-4 months | $120k-$130k

San Jose

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Santa Clara

in

Bathroom Addition

3 months | $75k-$80k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page