top of page
logo

Burlingame

This bathroom remodel in Burlingame was designed to evoke a sense of refined luxury while making a bold visual statement. The centerpiece of the space is a striking walk-in shower clad in deep green wall tiles, creating a rich, moody backdrop that anchors the entire design.


The custom shower pan features a black-and-white geometric pattern that continues seamlessly into the main flooring, visually elongating the room and adding dynamic contrast. A warm brown vanity introduces natural texture and grounds the color palette, while a mix of metallic fixtures throughout lend a subtle yet distinctive elegance.


A sculptural central light fixture adds both drama and softness, casting warm light across the space and enhancing the layered materials and finishes. The result is a carefully curated bathroom that balances bold design choices with timeless sophistication.


Finishes/Hardware: 

Ann Sacks https://annsacks.kohler.com

Brizo https://www.brizo.com

Porcelanosa https://www.porcelanosa.com/us/


*Please note construction times vary from project to project and scope of work. The length of projects does not include time for the planning process. Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.*

1_1ng.webp

Design, Drafting & Architectural

1_1ng.webp

Bathroom Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Architectural Review

Project Gallery

3_2.jpg

Full Home Remodel

8-10 Months | $500k-600k

Saratoga

3_2.jpg

Home Remodel

3-4 Months | $120k-140k

Los Altos

3_2.jpg

Complete Home Remodeling

3-6 months | $200k-$250k

San Jose

3_2.jpg

Kitchen and Bathroom

3 Months | $100k

San Francisco

3_2.jpg

Home Remodel and Addition

8 -10 months | 400k -500k

San Jose 2023

3_2.jpg

Kitchen Transformation

3 months | $60k-$80k

Morgan Hill

3_2.jpg

Kitchen and Bathroom Remodel

4-6 months | 70k - 90k

Los Gatos

3_2.jpg

Kitchen Remodeling

2-3 Months | 45-55K

Sunnyvale

3_2.jpg

Addition and Home Remodel

7-9 Months | $459K- $650K

San Jose

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Burlingame

in

Beautiful Bathroom Remodel

1-1.5 months | $35k-$38k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page