top of page
logo

White & Blue Bathroom Remodel in Belmont

This residential bathroom remodel in Belmont focuses on transforming the master bathroom into a modern, functional, and stylish space. The renovation includes the installation of a spacious shower and freestanding bathtub, designed for comfort and relaxation. The updated layout also features a floating toilet with custom cabinetry to maximize space and enhance the overall aesthetic of the room.


The design combines clean, contemporary lines with a soothing color palette. The use of white and blue tiles throughout the space creates a fresh and serene atmosphere, with attention to detail in both the floor and wall treatments. The floating toilet and cabinets not only contribute to a minimalist, modern look but also improve accessibility and ease of cleaning. The bathtub and shower area are designed with luxury and convenience in mind, offering both style and practicality.


Finishes/Hardware: Bay Stone http://www.baystonedepot.com


1_1ng.webp

Bathroom Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Newly Built Home

10-12 months | $1.5M-$1.7M

Redwood City

3_2.jpg

Home Remodel and Addition San Jose

8 -10 months | 400k -500k

San Jose 2023

3_2.jpg

Home Remodel

4-5 months | $120k-$130k

San Jose, 2024

3_2.jpg

Home Remodel & Addition

6-8 months | $270k-$290k

San Jose

3_2.jpg

Full Home Remodeling

Design by Golden View Renovation

Menlo Park

3_2.jpg

Complete Home Remodel and JADU

8-10 Months | $500k-600k

Saratoga

3_2.jpg

Full Home Remodel

Design by Golden View

Burlingame

3_2.jpg

Full house remodel

3-3.5 Months | $120K-$170K

Sunnyvale

3_2.jpg

General Remodel

2.5-3.5 Months | $130k-150k

Hayward

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Belmont

in

White & Blue Bathroom Remodel

6 weeks | $36k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page