top of page
logo

Ken & Grace Lu, Foster City

Our clients in Foster City felt their existing carport was being underutilized. They came to us with several ideas and ultimately landed on the most practical choice for their family. The carport conversion into an ADU (accessory dwelling unit) provided more living space for the entire family and a future source of rental income. The conversion included our entire team, from our in-house architects, engineers, and designers to our subcontractors. The new ADU included all-new framing, new shear walls, a new sewer line, and plumbing for the bathroom and kitchenette. With a new electrical plan, our clients can rest assured there is ample power for their entire home. Other finishes included custom cabinets, new appliances, finished textured walls, windows, and GFCI outlets. Our team made sure everything was planned and built according to city code.       


Finishes/Hardware: Provided by the following showrooms -

https://www.tubz.net

http://www.baystonedepot.com

https://www.bedrosians.com

1_1ng.webp

Design, Drafting & Planning

1_1ng.webp

ADU & Room Addition

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Bathroom Remodel

1-1.5 months | $30k-$35k

San Carlos

3_2.jpg

Kitchen and Living room remodel

4-5 months | $250k-$275k

Redwood City

3_2.jpg

Bathtub conversion

3-4 weeks | $24K-$26K

Redwood City

3_2.jpg

Bathroom Remodeling

6-8 weeks | $45K-$49K

La Honda

3_2.jpg

Home Remodel & Addition

6-7 months | $380k-$400k

Newark

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Kitchen Remodel

7-9 weeks | $47k-$53k

Foster City

3_2.jpg

Bathroom Remodels

2-3 months | $70k-$80k

Oakland

3_2.jpg

Bathroom Addition

3 months | $75k-$80k

Santa Clara

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Foster City

in

Garage conversion to ADU

3-4 months | $110K-$130K

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page