top of page
logo

Fremont

space after significant water damage, while preserving the design vision as outlined in the initial renderings.

The renovation carefully balances the need for repairs with an upgraded aesthetic, creating a fresh,

functional, and inviting environment.


The result is a sleek, modern kitchen that mirrors the original plans—featuring custom cabinetry, high-end appliances, and durable, water-resistant materials designed to withstand the challenges of the space. New, seamless countertops made from quartz add elegance and durability, while a neutral color palette brings warmth and brightness to the room.


The layout was optimized for improved flow and functionality, including updated storage solutions and an expanded island for increased prep space and seating. Soft-close drawers and smart cabinetry options ensure everything has its place, contributing to a clutter-free, organized cooking area.


Strategically placed recessed lighting and under-cabinet LED fixtures illuminate the room beautifully, complementing the bright white and light wood tones throughout. The floor, replaced with moisture-resistant, high-quality vinyl planks, completes the updated look while providing peace of mind against future water issues.


Services provided: Kitchen Remodel, Design Services, Painting, Lighting, Plumbing, Electrical, Flooring, Appliance installation.


Finishes/Hardware:

Emser https://www.emser.com

Raphael stone https://www.raphaelstoneusa.com

Flooret https://www.flooret.com



1_1ng.webp

Design, Drafting & Planning

1_1ng.webp

Kitchen Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Planning Review

Project Gallery

3_2.jpg

Bathroom Remodel

1-1.5 months | $30k-$35k

San Carlos

3_2.jpg

Kitchen and Living room remodel

4-5 months | $250k-$275k

Redwood City

3_2.jpg

Bathtub conversion

3-4 weeks | $24K-$26K

Redwood City

3_2.jpg

Bathroom Remodeling

6-8 weeks | $45K-$49K

La Honda

3_2.jpg

Home Remodel & Addition

6-7 months | $380k-$400k

Newark

3_2.jpg

Modern Home Renovation & Patio Deck

6-7 months | $400k-$500k

Palo Alto

3_2.jpg

Kitchen Remodel

7-9 weeks | $47k-$53k

Foster City

3_2.jpg

Bathroom Remodels

2-3 months | $70k-$80k

Oakland

3_2.jpg

Bathroom Addition

3 months | $75k-$80k

Santa Clara

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Fremont

in

Kitchen Remodel in Fremont

2 months | $120k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page