top of page
3_2.jpg

Garage conversion to ADU

in

Foster City

7-9 Months | $459K- $650K

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Foster City

Our clients in Foster City felt their existing carport was being underutilized. They came to us with several ideas and ultimately landed on the most practical choice for their family. The carport conversion into an ADU (accessory dwelling unit) provided more living space for the entire family and a future source of rental income. The conversion included our entire team, from our in-house architects, engineers, and designers to our subcontractors. The new ADU included all-new framing, new shear walls, a new sewer line, and plumbing for the bathroom and kitchenette. With a new electrical plan, our clients can rest assured there is ample power for their entire home. Other finishes included custom cabinets, new appliances, finished textured walls, windows, and GFCI outlets. Our team made sure everything was planned and built according to city code.       


Finishes/Hardware: Provided by the following showrooms -

https://www.tubz.net,

http://www.baystonedepot.com,

https://www.bedrosians.com

1_1ng.webp

Designing & Architectural planning

1_1ng.webp

ADU & Room Addition

1_1ng.webp

ADU - accessory dwelling unit

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Architectural Review

Thanks for submitting!

Project Gallery