top of page

Fremont

space after significant water damage, while preserving the design vision as outlined in the initial renderings.

The renovation carefully balances the need for repairs with an upgraded aesthetic, creating a fresh,

functional, and inviting environment.


The result is a sleek, modern kitchen that mirrors the original plans—featuring custom cabinetry, high-end appliances, and durable, water-resistant materials designed to withstand the challenges of the space. New, seamless countertops made from quartz add elegance and durability, while a neutral color palette brings warmth and brightness to the room.


The layout was optimized for improved flow and functionality, including updated storage solutions and an expanded island for increased prep space and seating. Soft-close drawers and smart cabinetry options ensure everything has its place, contributing to a clutter-free, organized cooking area.


Strategically placed recessed lighting and under-cabinet LED fixtures illuminate the room beautifully, complementing the bright white and light wood tones throughout. The floor, replaced with moisture-resistant, high-quality vinyl planks, completes the updated look while providing peace of mind against future water issues.


Services provided: Kitchen Remodel, Design Services, Painting, Lighting, Plumbing, Electrical, Flooring, Appliance installation.


Finishes/Hardware:

Emser https://www.emser.com

Raphael stone https://www.raphaelstoneusa.com

Flooret https://www.flooret.com



1_1ng.webp

Designing & Architectural planning

1_1ng.webp

Kitchen Remodeling

Schedule an appointment 

✓ Design Consulting   

✓ Cost Estimation 

✓ Architectural Review

Project Gallery

3_2.jpg

Full Home Remodel

8-10 Months | $500k-600k

Saratoga

3_2.jpg

Home Remodel

3-4 Months | $120k-140k

Los Altos

3_2.jpg

Complete Home Remodeling

3-6 months | $200k-$250k

San Jose

3_2.jpg

Kitchen and Bathroom

3 Months | $100k

San Francisco

3_2.jpg

Home Remodel and Addition

8 -10 months | 400k -500k

San Jose 2023

3_2.jpg

Kitchen Transformation

3 months | $60k-$80k

Morgan Hill

3_2.jpg

Kitchen and Bathroom Remodel

4-6 months | 70k - 90k

Los Gatos

3_2.jpg

Kitchen Remodeling

2-3 Months | 45-55K

Sunnyvale

3_2.jpg

Addition and Home Remodel

7-9 Months | $459K- $650K

San Jose

Related Projects

3_2.jpg

Please note construction times vary from project to project and scope of work.
The length of projects does not include time for the planning process.
Due to the changing costs of materials, budget ranges will vary and pricing is subject to change.

Fremont

in

Kitchen Remodel in Fremont

2 months | $120k

that will take care of all your needs during the renovation process, will advise you with every question and will know the best about your project.

Each of our projects is assigned to a Success Project manager & Production Manager

bottom of page